(904) 387-5538

4234 Lakeside Drive, Jacksonville, FL 32210
office@port32jacksonville.com

Gallery | Reserve a Slip

St. Johns River Navigation

Using coordinates as published in "Waterway Guide" from the St. Johns River to Downtown Jacksonville:
Dames Point Bridge
Mile Marker: 13.1
Lat / Lon: N 30° 23.104' / W 081° 33.432'
Bridge Type: Fixed
Vertical Clearance (Closed): 169.00'
Horizontal Clearance: 900.00'

Mathews Bridge
Mile Marker: 21.8
Lat / Lon: N 30° 19.632' / W 081° 37.460'
Bridge Type: Fixed
Vertical Clearance (Closed): 86.00'
Horizontal Clearance: 376.00'

Isaiah D. Hart Bridge
Mile Marker: 22.8
Lat / Lon: N 30° 18.943' / W 081° 37.647'
Bridge Type: Fixed
Vertical Clearance (Closed): 135.00'
Horizontal Clearance: 960.00

Using coordinates as published in "Waterway Guide" from Downtown Jacksonville to Ortega River Bridge:
Main Street Bridge
Mile Marker: 24.7
Lat / Lon: N 30° 19.387' / W 081° 39.510'
Bridge Type: Lift
Vertical Clearance (Closed): 40.00'
Horizontal Clearance: 350.00'
Schedule: VHF Channel: 09
Note: The draw timing for the Main Street (1/SR 90) drawbridge must open on signal except that, from 7 a.m. to 8:30 a.m. and from 4:30 p.m. to 6 p.m., Monday through Saturday except Federal holidays, the draw span need not be opened for the passage of vessels.
Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts.

Acosta Bridge
Mile Marker: 24.8
Lat / Lon: N 30° 19.314' / W 081° 39.852'
Bridge Type: Fixed
Vertical Clearance (Closed): 75.00'
Horizontal Clearance: 195.00'

FEC Railroad Bridge
Mile Marker: 24.9
Lat / Lon: N 30° 19.297' / W 081° 39.888'
Bridge Type: Bascule
Vertical Clearance (Closed): 5.00'
Horizontal Clearance: 195.00'
Schedule: VHF Channel: 09; bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts.
Note: The draw shall operate as follows: (1) The bridge shall be constantly tended and have a mechanical override capability for the automated operation. A radiotelephone shall be maintained at the bridge for the safety of navigation. (2) The draw is normally in the fully open position, displaying flashing green lights to indicate that vessels may pass. (3) When a train approaches, large signs on both the upstream and downstream sides of the bridge flash Bridge Coming Down, the lights go to flashing red, and siren signals sound. After an eight minute delay, the draw lowers and locks if there are no vessels under the draw. The draw remains down for a period of eight minutes or while the approach track circuit is occupied. (4) After the train has cleared, the draw opens and the lights return to flashing green.

To Next:  .56 Miles
Bearing 225°

Fuller Warren Bridge
Mile Marker: 25.4
Lat / Lon: N 30° 18.919' / W 081° 40.319'
Bridge Type: Fixed (I-95)
Vertical Clearance (Closed): 75.00'
Horizontal Clearance: 195.00

To Next:  1.29 Miles
Bearing 190°

Between flashing #2 red and flashing green buoy
N 30° 17.632'
W 081° 40.475'
To Next:  .60 Miles
Bearing 226°

Red #2 unlit
N 30° 17.180'
W 081° 40.936'
To Next:  .91 Miles
Bearing 274°

Between flashing #5 green and flashing red buoy
N 30° 17.151'
W 081° 42.079
To Next:  .37 Miles
Bearing 249°

Ortega River Bridge
Lat / Lon: N 30° 16.822' / W 081° 42.329'
Bridge Type: Bascule
Vertical Clearance (Closed): 9.00'
Horizontal Clearance: 53.00'
Schedule: Opens on signal. Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts.
VHF Channel: 09
Phone: 904-545-2354

Contact Port 32 Jacksonville at Ortega Landing on VHF 16 or call (904) 387-5538 (landline, no texts).

Lease A Slip


About Jacksonville


OLM Preferred Yacht Brokerage Partner:

Curtis Stokes & Associates

Contact Us: (904) 387-5538
office@port32jacksonville.com

Click here for map of Ortega Harbor


PORT 32 Jacksonville
4234 Lakeside Drive • Jacksonville, Florida 32210
Phone: (904) 387-5538 • Fax: (904) 387-6422

Website & Marketing by L.E.T. Group

Website Design Copyright © 2012-2023, L.E.T. Group, Inc. All Rights Reserved.

  
 
Friday June 2, 2023